Warning: Undefined property: DOMElement::$tagName in /home/thecoeng/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 855
Warning: Undefined property: DOMElement::$tagName in /home/thecoeng/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 855
Warning: Undefined property: DOMElement::$tagName in /home/thecoeng/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 855
Warning: Undefined property: DOMElement::$tagName in /home/thecoeng/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 855
Warning: Undefined property: DOMElement::$tagName in /home/thecoeng/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 855
Warning: Undefined property: DOMElement::$tagName in /home/thecoeng/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line 855
Warning: Undefined property: DOMElement::$tagName in
/home/thecoeng/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-style-sanitizer.php on line
457 Warning: Undefined property: DOMElement::$tagName in
/home/thecoeng/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line
855 Warning: Undefined property: DOMElement::$tagName in
/home/thecoeng/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line
855 Warning: Undefined property: DOMElement::$tagName in
/home/thecoeng/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line
855 Warning: Undefined property: DOMElement::$tagName in
/home/thecoeng/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line
855 Warning: Undefined property: DOMElement::$tagName in
/home/thecoeng/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line
855 Warning: Undefined property: DOMElement::$tagName in
/home/thecoeng/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line
855 Warning: Undefined property: DOMElement::$tagName in
/home/thecoeng/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line
855 Warning: Undefined property: DOMElement::$tagName in
/home/thecoeng/public_html/wp-content/plugins/accelerated-mobile-pages/includes/vendor/amp/includes/sanitizers/class-amp-tag-and-attribute-sanitizer.php on line
855 News Lagos-Ibadan: Govt alerts motorists over traffic diversion on Kara Bridge
Lagos-Ibadan: Govt alerts motorists over traffic diversion on Kara Bridge
The Lagos State Government has announced traffic diversion at the Ogun State bound lane of Kara Bridge on the Lagos-Ibadan expressway from Saturday, September 3, 2022, to enable construction repairs on the bridge by the Federal Government contractor.
This is in reference to the notification received from the Federal Ministry of Works on the ongoing reconstruction works along the Berger-OPIC Axis of the Lagos-Ibadan Expressway Project for an emergency fixing of the expansion joints that got damaged.
According to the notification, the urgent repair work needed to be carried out on three of the expansion joints to prevent accidents and vehicular damages, hence, the need to inform the residents and motorists on the outbound Lagos-Ibadan Expressway.
State Commissioner for Transportation, Dr. Frederic Oladeinde, who made the announcement, said the state government would collaborate with the Federal Road Safety Corps, FRSC, the Lagos State Traffic Management Authority, LASTMA, and the Ogun State Traffic Compliance and Enforcement Corps, TRACE, to provide adequate diversion and effective traffic management systems during the period of the repair works.
He said, “Based on the notification received, we advise the general public to drive with caution along this route during the period of the repair and exercise patience,” adding that interventions will be put in place to minimize inconveniences.
Oladeinde appealed for the cooperation of the general public with the stationed traffic control officers by adhering to traffic laws and regulations in order to prevent avoidable gridlock and ensure free and steady flow of traffic while the repair works last.
Recent Posts
India Investigates Alleged Rape And Murder of Doctor, Hospital Claims Innocence An Indian man…
Taliban Launches Midnight Assault On Pakistan Army, Killing 16 The Pakistani Taliban claimed a brazen…
IMF Provides $1.1bn in Critical Funding to Ukraine Amid Ongoing Crisis The International Monetary Fund…
Trump Campaign Adviser Calls Incoming UK Ambassador To US a 'Moron' A campaign adviser to…
US Debt ceiling Debate Rages Ahead Of looming Shutdown With a shut down of the…
Suspected 'Witchdoctors' Arrested Over Attempt To 'Bewitch' Zambia's President Two men have been arrested in…